top of page
Testing Event2.0
This is a full scenario test of the following functions:
-
Auto groupage HUB consolidation
-
Auto groupage auto fill
-
Auto groupage overflow
-
Auto reallocation to a more cost effective equipment type to larger and back to smaller
-
Auto split of an FTL multi orderlines
-
3D viewer
-
x2 stop view when on different routes
FTL
Groupage
Updating the files
You can copy these files you your machine. Create a order number with your intials and a 5 digit number.
Then reuse them from your machine each time.
-
Open each file in order, 1,2,3,4
-
Update the order numbers in file 1 by adding a unqiue at the top and dragging down
-
In file 2,3,4 make sure you update the DA to match file 1
-
In file 2, make sure you continue the unique order number for the lines below DA
-
In file 3,4 make sure you copy across the order numbers to the updated orders.
-
Its VERY important you check
-
all dates in each file are the same
-
Each order number has not been used before.
-
That you make sure you move all orders into RECYCLE (using ROUTE2) before you import orders
-
Where are you importing these files?
All the rate cards are already imported and correct
-
QA REC
-
UAT REC
How to import files and the expected result
-
Import file 0
-
Create x2 groupage routes to demonstrate HUB functionality​
-
-
Check notification
-
Check 1 groupage route HUB1 created (24plts, 10 stops on route)
-
Check 1 groupage route HUB2 created for BA postcode (2plts, 1 stop on route)
-
Confirm stops and plts created over both routes are correct
-
Import file 1
-
Move a stop off groupage to FTL, add another Stop to Groupage​
-
-
Check notification
-
Check the HUB1 1st groupage stop decreases from 10 stops to 9 stops
-
Check 1 additional groupage route HUB3 created for BS postcode (4 plts, 2 stops on route)
-
Check 7.5t created for postcode DA (13plts, 1 stop on route)
-
Check 3D viewer shows correctly
-
Import file 2
-
To update the BS groupage stop to 25plts to move to FTL
-
-
Check notification
-
Check the BS order has moved from Groupage to its own 25plt FTL
-
Check you can see x2 orderlines in Stop detail.​
-
-
Check the groupage has reduced by 1 stop
-
Import file 3
-
We will split the FTL to 25plts and 2plts on Groupage
-
Find the BS order and click on the Stopo to make sure you can see x2 Stop popups
bottom of page






